Cooper Cove Marine Terminal Expansion
Involves a continuation of the existing fleet dock to take advantage of existing services and extending the wharf by 448 m, bringing it to a length of 878 m. The area behind the wharf face will be infilled to create storage and laydown areas, warehousing, and fabrication halls, creating over 100,000 m2 of additional space.
Cooper Cove Marine Terminal Expansion
A berth aligning with an existing runway will allow construction of a pipe rack and spooling line. A Ro-Ro ramp is integrated into the design to allow the efficient loading and unloading of modules and other heavy loads.
Suscribe to our Newsletter
Stay connected and informed about latest news and updates